Theories and Techniques of Oral Implantology (vol.2) (published 1970)   Dr. Leonard I. Linkow

Previous Page Next Page

This is an archival HTML version of this book originally hosted here in 2006. The HTML may not display well on modern browsers. Please view the modern PDF Version for a better viewing experience.

 

Mandibular endosseous implant interventions 373

Fig. 9-127. Four remaining anterior teeth are prepared.

Fig. 9-130. Two vent-plants are screwed into the holes

Fig. 9-128. A round bur is drilled directly through the fibromucosal tissue and into the bone.

Fig. 9-131. A seven-unit gold splint was fabricated, as well as a denture with an internal framework of gold, to create an accurate and frictional grip over the splint.

Fig. 9-129. Both burs are made parallel to each other.

Fig. 9-132. The gold splint is cemented with oxyphosphate of zinc.

1 Round bur drilled through fibromucosal tissue & into mandibular bone
2 Vent-plants screwed into holes in lower jaw
3 Seven unit gold splint, & denture with internal framework of gold
4 Mandibular gold splint cemented with oxyphosphate of zinc
5
6



Previous Page Page 373 Next Page
Copyright warning: This information is presented here for free for anyone to study online. We own exclusive internet copyrights on all content presented on this website. We use sophisticated technology to identify and legally close down websites that reproduce copyrighted content without permission - so please don’t do it.